DOUBLE SIDED FORMWORK WATERPROFING

  • STEP 1 : Blinding Concrete
  • STEP 2 : HYFIX DrySprinkle Foundation Application: 3kg/m²
  • D03 : Cold Joint Detail
  • D01 : TieRod Repair Detail
  • D02 : Protruding Steel Bar Detail
  • D04 : Riglets/Fillets Detail
  • STEP 3 : HYFIX Brush Application: 1.Layer Red 1kg/m²
  • STEP 4 : HYFIX Brush Application: 2.Layer Gray 1kg/m²
  • STEP 5 : Backfilling

Related Product