DOUBLE SIDED FORMWORK WATERPROFING

  • STEP 1: Blinding Concrete
  • STEP 2: HYFIX Dry-Sprinkle Foundation Application
  • D03: Cold Joint Detail
  • D01: Tie-Rod Repair Detail
  • D02: Protruding Steel Bar Detail
  • D04: Riglets/Fillets Detail
  • STEP 3: HYFIX Brush Application
  • STEP 4: HYFIX Brush Application
  • STEP 5: Backfilling