FIXPROOF PU BITUMEN TWO COMPONENT, BITUMEN-REINFORCED AND POLYURETHANE BASED LIQUID WATERPROOFING COMPOUND

  • Perfect waterproofing on areas where plant root resistance is required
  • Fast setting
  • Can be applied as a thick layer; bubble-free application

ADVANTAGES

  • Can also be used as joint filler.
  • Can be applied as a thick layer; bubble-free application.
  • Effective water vapor barrier.
  • Fast curing.
  • Forms a very elastic film and firmly adheres to almost any surface with or without primers.
  • High tensile and tear strength, excellent abrasion resistance.
  • Perfect thermal strength.
  • Will not soften under any circumstances.
  • Resistant to cold, maintains elasticity even at -40 °C.
  • High resistance to chemicals.

TYPICAL APPLICATIONS

  • Internal and external applications,
  • Waterproofing against moisture or pressurized or non-pressure water,
  • Cement based screed, plaster and exposed concrete surfaced, corroded metal and galvanized steel surfaces, existing ceramic, mosaic, bitumen and acrylic coatings,
  • Foundations and flood-bearing walls,
  • Wet areas,
  • Areas that require plant root resistance,
  • Non-potable water tanks and ducts,
  • Deck roofs (must be covered/tiled),
  • Parking lots, garages,
  • Terraces and balconies,
  • Bridges and tunnels,
  • Light roofing made of metal and fibrous cement,
  • Gypsum and cement boards,
  • Asphalt and EPDM membranes,
  • Polyurethane insulation foams.

DIRECTIONS FOR USE

DIRECTIONS FOR USE

SURFACE PREPARATION

  • Clean the surface with a high pressure washer; oil, grease, fuel, and paraffin residues should be removed, and surface should be totally free from cement laitance, form-work release agents, loose particles, and cured membranes.
  • Surface irregularities and cracks should be repaired with FIXGROUT EXPAN.
Concrete Substrate Standards:
  • Hardness: R28: 15 Мра
  • Humidity: W<10%
  • Temperature: 5 °C - 35 °C
  • Relative Humidity: <85%

PRIMER APPLICATION

  • Use INTERPRIMER EPO WB as a primer. Please consult our technical department for substrates with high porosity and asphalt coatings.

APPLICATION

  • Add 20 lt Component A to 20 lt Component B, and mix using a low speed mixer until a homogenous mixture is achieved.
  • Apply the mixture with a brush or a roller in at least two layers. Do not wait for more than 48 hours between applications.Re-apply the primer if this time limit is exceeded (e.g. 4 days) or if you are not sure about bonding rates between layers. For airless spray applications, thin the mixture with a small quantity of solvent, especially for low-power machinery.

WATCHPOINTS

  • Remaining un-used materials may be stored for later use.
  • Apply only onto sound substrates.
  • Not suitable for use at swimming pools in contact with chemically processed water.

CONSUMPTION

1.0 - 1.5 lt/m²

PACKAGING

  • Component A: 20 lt container
  • Component B: 20 lt container